Our Process

Here's what to expect when you work with Pine

Details create success.

Phase 1

Consultation

Begin by initiating a one-on-one discussion aimed at assessing your requirements and considerations. We’ll delve into site specifics and zoning prerequisites, analyze our project outline, and formulate your unique project blueprint. If needed, we will work to find a local general contractor to engage with.

Phase 2

Feasibility

As needed, we can provide the expertise to engage with you and your contractor in conversations covering permitting procedures, sub-contractor selection, intricate design elements, interior finish selections, block configurations, and personalized customization options. 

 

Documentation

During this phase, we finalize and complete all the contracts and documents necessary for permitting. We then begin work on any custom design and engineering work that is specifically required for your area. Subcontractors and additional consultants will be engaged at this point if needed.

 

Fabrication

The general contractor begins work on site prep and foundations while Pine begins production on the pine block system. Well and Septic/Sewer work begins. Custom windows and doors are also ordered at this time.

Phase 3

Assembly

The general contractor completes all previous site and foundation work. They receive and assemble the Pine cabin system. All other elements of construction begin including windows, doors, and all finish work.

What's Covered

Payment Schedule

The payment schedule can be adjusted to fit any construction loan lending requirements.

$10k Deposit

In Phase 1, Once the initial agreement to proceed is signed, we require a $10k refundable deposit.

20% Order Deposit

Once feasibility is completed, or feasibility waiver signed an initial 20% order deposit is required.

30% Order Deposit

After final contracts are signed an additional 20% is due. This covers design and structural engineering work

40% Order Deposit

Once permits are issued and all designs & Engineering is approved, a 40% payment is required to begin production of your cabin system

10% Final Delivery

After final delivery of all pine blocks and materials is made, the remaining 10% of the project cost is due

Sample Project Timeline

This is an average estimated timeline that is plan and package dependent. A more detailed and accurate timeline is included with all of our orders.

3 Weeks

2-4 Weeks

2-4 Weeks

4-10 Weeks

3-6 Weeks